• History
  • Foundations
    • Deep Foundations
    • Solving Unique Problems
    • Shoring
  • Structures
    • Railroads
    • Horizontal Boring
    • Bridges & Heavy Construction
    • Dams & Spillways
  • Projects
    • KCT HIGHLINE BRIDGE
    • AUGER CAST PILES – Texas A&M
    • ROCK ISLAND BRIDGE
    • AUGER PILES – St. Jude Hosp.
    • UPRR BRIDGE OVER MUDDY CREEK
  • Careers
  • Contact

LG Barcus and Sons

Horizontal Boring

Horizontal Boring

Avoiding Open Trenches

Barcus has the resources to perform horizontal boring of 48” diameter to 96” diameter pipes, either steel or concrete. This technology is ideal for heavy traffic areas to minimize transportation delays and avoid open trenches.

84 in pipe welding
2
13.12 trenton
13.12
horizontal boring
1312
Preloader Image
2
13.12 trenton
13.12
1312
84 in pipe welding
horizontal boring
lg barcus

Contact Us
Send A Message
1-800-255-0180


© 2025 LG Barcus and Sons - All Rights Reserved | Privacy Policy | Powered by P-Tn

  • Facebook
  • LinkedIn

Copyright © 2025 LG Barcus and Sons - All Rights Reserved | Powered by P-Tn